How Long Does a House Extension Take? Typical Phases and What Affects the Programme

People often ask how long an extension will take. The honest answer is that it depends on the size and complexity of the project, but it helps to know the phases and where time tends to go.
Before work starts on site
Design and survey: developing the brief, drawings and structural input
Planning or permitted development: householder applications are usually determined within eight weeks, but preparation and any additional information can add time
Building Regulations approval and technical drawings
Party wall notices, where relevant
Tender, programme and ordering long lead-time items
On site
Setting out, groundworks and foundations
Structure and any steel needed to open up the existing house
Roof and weathertight shell
First fix, plastering and drying time
Kitchen, second fix, decoration and snagging
What can lengthen the programme
Unexpected ground conditions or drainage found when digging
Changes to design or finishes during the build
Delays to deliveries of windows, doors, steel or kitchens
Bad weather during groundworks and roofing
Waiting for inspections or approvals from third parties
What can shorten it
Finalising design and finishes before starting
Ordering lead-time items early
Clear decision-making during the project
A single team coordinating design, engineering and construction
Plan for living through it
Think about how you will use the kitchen, bathrooms and garden during works. Discussing access, working hours and temporary arrangements early makes the process easier for everyone.